Two lines on one mapJurisdiction and utility, both different from the city
Why it is worth a page: two houses two miles apart, both addressed “Oviedo, FL 32765”, can sit under two building departments with different portals, fee schedules and inspectors. A contractor who files with the wrong one stalls the job — and, on the Duke side, the rebate, because Duke requires the system to be approved by a licensed city or county inspector.
The utility line runs through here too. The City’s FAQ puts Florida Power & Light east of the C.R. 419 Econlockhatchee bridge and Duke Energy west of it. Chuluota lies east of the river, which by that description makes it FPL territory — and none of the Duke Home Energy Improvement figures on this site apply there. We have not researched FPL’s residential HVAC rebate offerings. Black Hammock’s meter we will not guess at either; the City publishes no boundary map, so the name on the bill is the answer. Duke or FPL.
The 2026 permit exemption does not cover an AC changeout
A residential air conditioning changeout always requires a building permit in Florida. There is no dollar-amount exemption. The new $7,500 permit exemption for single-family work, created by HB 803 (2026) and effective 1 July 2026, expressly does not apply to “any electrical, plumbing, structural, mechanical, or gas work” — s. 553.79(1)(g)2.b., Fla. Stat. — and a changeout is both mechanical and electrical work.
If a quote is cheap because nobody is pulling a permit, that is not a saving the law allows. Bill: CS/CS/HB 803 (2026), ch. 2026-63.